Skip to content
TSE Logo TheSTEAMEngine
  • About Me
  • Quizzes
  • Health and Fitness Updates
  • About Me
  • Quizzes
  • Health and Fitness Updates
Contact Me
  • Home
  • Projects
  • Refurbishments
All Hail the Chipper!
Posted inMachinery Refurbishments

All Hail the Chipper!

I picked this chipper/mulcher up a couple of years ago. It was being thrown out, so I thought I'd take ownership of it. Since then, I have covered it up…
Read More
The Dawn of a New Kitchen
Posted inRefurbishments

The Dawn of a New Kitchen

In the past few weeks, Steph has had a new kitchen installed. The old one had been active for twenty-six years and it was time for it to be skipped.…
Read More
Posted inRefurbishments

The Tack Room Refurb: Hours 28-32

This might be the last of the Tack Room posts, as I have finished it, pending whether a last bit is required that will add another two hours on. Either…
Read More
Posted inHand Tools Refurbishments

Repairing the Big Tool

The time finally arrived, the big adjustable spanner was to be refurbished. I had picked it up at a charity shop, six months ago. You could see that it was…
Read More
Posted inRefurbishments

The Tack Room Refurb: Hours 24-27

Another week, and another set of progress. Today was all about completing what I had started last week. I had put the inner-skin into place using pins, but wasn't sure…
Read More
Posted inRefurbishments

The Tack Room Refurb: Hours 18-23

The whiteboard is populated! It finally became time to do some more on the Tack Room. I decided to try a different way of constructing the shelves, so an experiment…
Read More
Posted inRefurbishments

The Tack Room – Update

There is still much to do on the tack room, with new materials having been bought, today. I have taken some time off of it, but will return with a…
Read More
Posted inRefurbishments

The Tack Room Refurb – Hours 14-17

So, I have managed another few hours on the project and I have almost completed the first of the four furniture pieces. I headed over with less tools, this time,…
Read More
Posted inRefurbishments

The Tack Room Refurb – Hours 8-13

Another day of building was here and I made my way over to the stables. Between 10am and 3pm, I carried on the endeavour of pigeon-holing the boot shelves. This…
Read More
Posted inRefurbishments

The Tack Room Refurb – Rough Plan

As promised, here is a plan out of the phases. I predict that each phase will take up to 15 hours to complete. The phases break down, as follows: Phase…
Read More

Posts pagination

1 2 Next page

Recent Posts

  • The Gandalf Swans!
  • Set Review – 71806 Cole’s Earth Mech
  • And So It Goes On!
  • Set Review – 31159 3in1 Surprising Spider
  • Keeping Mental Health in Check
Catagories
Contact Me
About Me
Privacy
Site Credits
Pinterest
YouTube
Copyright 2025 — TheSTEAMEngine. All rights reserved. Bloglo WordPress Theme
Scroll to Top